Green energy

Progress of solar power plants with battery systems

Progress of solar power plants with battery systems

Serbia is seriously committed to developing renewable energy, announcing the start of construction of self-balancing solar power plants with battery systems, which is the largest investment in renewable energy in Europe this year.

The one-gigawatt project was launched after a meeting with financiers, including leading global companies and financial institutions such as US EXIM, MIGA and the Swedish Export Credit Corporation.

Solar power plants with battery systems

The Swedish Ambassador to Serbia, Annika Ben David, also attended the meeting.

The project is planned to be completed by 2028 and will bring an additional gigawatt of renewable electricity, with annual production of 1.2 terawatt-hours.

Serbia is fully committed to the green transition and economic development, attracting major European projects; last year alone it attracted €4.5 billion in foreign direct investment.

Serbia is planning GDP growth of 3.5 percent this year, which shows its stability and potential for further economic development.

Source: greennews.rs (in Serbian)

👉 See other solar power plants we have built

Would you like to cut your electricity costs too?
👉 Contact us and we will prepare an offer tailored to your needs.

We guide you through the whole process of signing a prosumer contract, so that you can hand your surplus electricity to EPS for storage and later use it to reduce your electricity bills. To learn more about the prosumer model in advance, see the official brochure of the Center for the Advancement of the Environment (in Serbian).

How much could you save?

Send us your electricity bill and get a solar plant proposal and savings estimate, with no obligation.

Get a quote 069 010 99 99

Podrinje Komerc, 412 kW solar power plant

Green energy

A solar recipe for lower bills

Find out how solar panels cut electricity bills and turn the sun's energy into your long-term advantage.